However, it will be open on weekends unless the contractor is working. WIS 139 over the Popple River will be reduced to a single lane between Sheldon Road and Forest Road 2161, with traffic controlled by temporary signals. Motorists can expect WIS 139 to be closed at the bridge crossing the Nicolet State Trail, with traffic detoured on US 8, WIS 101 and WIS 70. Nicolet State Trail/Long Lake outlet bridge:Ĭrews will continue to form and set reinforcing steel for the new bridge deck.Ĭrews will continue curing the concrete overlay on the southbound lane. Project Description: Crews will make concrete deck repairs on the WIS 139 Popple River Bridge, replace the concrete deck on the WIS 139 bridge over the Nicolet State Trail and replace an end wall on the Long Lake Outlet Creek culvert.
Location: Cavour – Brule River, Popple River and Nicolet State Trail/Long Lake outlet bridges Width restrictions of a maximum of 12 feet are in place for the duration of the project.All movements through the WIS 13 and WIS 21 intersection will be open to traffic or require a short detour using the wayside road directly west of the intersection.